Get Resource

Enter your work email to get this resource. We'll also send one maritime compliance update per week — unsubscribe anytime.

Cancel
Shelton Street, London [email protected] (+44) 7445 99 7167
All Articles Guides Downloads Templates Glossary Courses
Ask IMT AI — ask anything about SIRE 2.0
Reviewed for accuracy Aligned to IMO Convention Based on OCIMF Guidelines Written with industry experts
Getting Started Advanced Downloads Training
SIRE 2.0 Learning Path — Article 1 of 10
10% Complete
CVIQ Inspection in ProgressLive SIRE 2.0 assessment — Hardware, Procedures & Human Factors
SIRE 2.0 · Article 1 of 10 Beginner

SIRE 2.0 Explained: What Every Tanker Crew Needs to Know

Beginner → Intermediate → Advanced
Reviewed ByCapt. A. Meintjes, Maritime Compliance Expert
Last UpdatedJuly 2026
Next ReviewJanuary 2027

In September 2024, OCIMF retired the inspection questionnaire that had governed tanker vetting for over a decade and replaced it with something built entirely differently. SIRE 2.0 doesn't just digitise the old process — it changes what inspectors look for, how they score it, and who on board is expected to answer for it.

What You'll Learn in This Lesson

  • What SIRE 2.0 is, and why OCIMF replaced VIQ7 with it
  • The three assessment dimensions: Hardware, Procedures, and Human Factors
  • How the CVIQ question library keeps every inspection unique
  • Why SIRE 2.0 can't be prepared for by memorising past questions
  • What this shift means for how your crew should train going forward

For a tanker crew, that shift matters more than any regulatory update in recent memory. This article walks through what SIRE 2.0 actually is, how an inspection under the new regime works, and what your crew should be doing differently to prepare for one.

What SIRE 2.0 Replaced, and Why

The Ship Inspection Report Programme, known simply as SIRE, has existed since 1993. Oil majors, charterers, and terminal operators have used it as a shared basis for judging whether a tanker was fit for their operations. For most of its life, that meant a long, fixed questionnaire — commonly referred to by its final version, VIQ7 — with binary yes-or-no answers that crews could, in practice, prepare for by memorising likely questions.

OCIMF permanently retired VIQ7 on 2 September 2024 and made SIRE 2.0 the tanker industry's sole commercial inspection regime, and it was built to close exactly that loophole. Rather than a fixed list, each inspection now generates its own bespoke questionnaire — the Compiled Vessel Inspection Questionnaire, or CVIQ — pulled from a much larger question library specific to that vessel and voyage. No two CVIQs look the same, and every crew member aboard is expected to demonstrate real operational competence rather than a rehearsed answer.

The redesign reflects a fairly blunt conclusion OCIMF reached: most maritime incidents don't come from equipment that has failed outright — they come from how people interact with that equipment. SIRE 2.0 was built around that finding, which is why human performance now carries as much weight in an inspection as the condition of the hardware.

The Three Dimensions of a SIRE 2.0 Inspection

Every question in the CVIQ is drawn from one of three assessment dimensions:

This last dimension is the real departure from VIQ7. Inspectors are trained to observe how a crew member arrives at an answer, not just whether the answer is technically correct. Assessment of the human element draws on nine defined Performance Influencing Factors, which examine things like fatigue, communication, and situational awareness rather than pure technical knowledge.

Rehearsed answers no longer pass a SIRE 2.0 inspection — inspectors are trained to notice the difference between reciting a procedure and understanding why it exists. IMT Training Notes

How the CVIQ Question Library Actually Works

Rather than asking every vessel the same fixed set of questions, SIRE 2.0 draws from several categories of questions each time a CVIQ is generated:

With roughly 100 tailored questions drawn from a large question library per inspection, no two SIRE 2.0 inspections look alike, which is precisely the point — a crew cannot prepare by memorising last year's inspection report.

Download the Full SIRE 2.0 Readiness Guide (PDF)

The complete CVIQ question library breakdown, a Human Factors self-assessment checklist, and a 30-day preparation timeline — sent straight to your inbox.

We'll also send you one maritime compliance update per week. Unsubscribe anytime.

How Responses Are Graded

VIQ7's binary yes/no format has been replaced with a graded, four-tier scale. An inspector no longer records a single pass or fail — they record how well a hardware item, procedure, or crew response actually measured up, which produces a far more detailed and defensible record than the old system allowed.

That detail comes at a cost for operators who are used to a quick pass. Because a single underlying defect can now generate as many as six separate observations spread across different chapters of the report, a problem that would once have shown up as one line item can multiply across the CVIQ. Preparation now has to address root causes, not individual checklist items.

What This Means for Crew Preparation

The practical implication for any tanker crew is straightforward but demanding: everyone on board, not just the officer likely to be questioned, needs to be able to explain the reasoning behind a procedure, not just perform it. Some practical steps that IMT recommends to operators preparing for a SIRE 2.0 inspection:

Crews that treat SIRE 2.0 readiness as a continuous habit — rather than a task to complete the week before an inspection — consistently score better across the Hardware, Procedures, and Human Factors dimensions alike.

Not Sure Where Your Fleet Stands?

Talk to one of IMT's compliance advisors about a free readiness assessment for your current inspection cycle.

Contact an Expert

Common Mistakes Operators Are Still Making

Even two years into the new regime, the same avoidable mistakes keep showing up in inspection reports:

Get Your Crew SIRE 2.0 Ready

IMT's SIRE 2.0 Readiness course walks your officers and crew through real CVIQ scenarios, human factor interview technique, and hardware documentation practice.

View the Course Talk to an Advisor

Download Center

Everything from this article, in a format you can print, share, or file.

Guide · PDF

SIRE 2.0 Readiness Guide

Get Resource →
Checklist · XLSX

CVIQ Pre-Inspection Checklist

Get Resource →
Template · DOCX

Human Factors Drill Template

Get Resource →
Case Study · PDF

Cutting Detentions by 40%

Read Case Study →
Briefing Deck · PPTX

Crew Toolbox Talk: SIRE 2.0

Get Resource →
Tracker · XLSX

Inspection History Log

Get Resource →

Frequently Asked Questions

What was SIRE 2.0 replacing?

It replaced VIQ7, the previous fixed-questionnaire version of OCIMF's Ship Inspection Report Programme, which was permanently retired on 2 September 2024.

Is SIRE 2.0 only for oil tankers?

No. It applies across oil, chemical, gas, and LPG tankers as OCIMF's sole commercial vetting tool for these vessel types.

Can a crew still prepare by studying past inspection questions?

Not effectively. Because each CVIQ is algorithmically generated from a large question library, memorising a previous inspection's questions offers little protection against the next one.

What are Performance Influencing Factors?

They are the nine defined factors — covering areas like fatigue, communication, and situational awareness — that inspectors use to assess the human element of a crew's performance during an inspection.

Does SIRE 2.0 affect Port State Control inspections too?

They remain separate regimes, but they scrutinise overlapping areas — maintenance records, crew competency, and safety management systems — so preparing well for one typically strengthens the other.

Test Your Knowledge

5 questions · pass with 4/5 to unlock your SIRE 2.0 Introduction certificate.

1. What did SIRE 2.0 permanently replace?

2. What is the CVIQ?

3. Which of these is NOT one of the three assessment dimensions?

4. How many Performance Influencing Factors does SIRE 2.0 use?

5. Why can't a crew prepare by memorising a past inspection's questions?

🏅

Congratulations!

Score: 5/5

Badge Earned — SIRE 2.0 Introduction

✓
You completed Lesson 1 / 10
SIRE 2.0 Explained
Continue: CVIQ →

References

Join 30,000+ Maritime Professionals

Get one practical compliance update in your inbox every week — no spam, unsubscribe anytime.

Need SIRE 2.0 training? Enrol