Get Resource

Enter your work email to get this resource. We'll also send one maritime compliance update per week — unsubscribe anytime.

Cancel
Shelton Street, London [email protected] (+44) 7445 99 7167
All Articles Guides Downloads Templates Glossary Courses
Ask IMT AI — ask anything about SIRE 2.0
Reviewed for accuracy Aligned to IMO Convention Based on OCIMF Guidelines Written with industry experts
Getting Started Advanced Downloads Training
SIRE 2.0 Learning Path — Article 2 of 10
20% Complete
CVIQ Being GeneratedBespoke question set — unique to this vessel, this inspection
SIRE 2.0 · Article 2 of 10 Beginner

CVIQ Explained: How Your Inspection Questionnaire Gets Built

Beginner Intermediate Advanced
Reviewed ByCapt. A. Meintjes, Maritime Compliance Expert
Last UpdatedJuly 2026
Next ReviewJanuary 2027

Ask any officer who has been through a SIRE 2.0 inspection what surprised them most, and most will say the same thing: the questionnaire didn't look like the one their vessel got last time — or the one a sister ship got the week before. That's not an accident. It's the CVIQ, and it's the mechanism that makes SIRE 2.0 fundamentally different from the fixed-checklist inspections crews grew up with.

What You'll Learn in This Lesson

  • What CVIQ stands for, and what it replaced
  • How OCIMF's system builds a bespoke questionnaire for every inspection
  • The four question categories: Core, Rotational, Campaign, and Conditional
  • Why a CVIQ can't be prepared for by memorising a past inspection
  • What this means practically for how a crew should train

This article breaks down exactly what a CVIQ is, how OCIMF's system builds one for each inspection, and what that means practically for how a crew should prepare.

What CVIQ Stands For, and What It Replaced

CVIQ stands for Compiled Vessel Inspection Questionnaire. Under the old VIQ7 regime, every tanker inspection worked from the same static list — long, familiar, and, over time, predictable enough that experienced crews could anticipate most of what an inspector would ask. SIRE 2.0 replaced that fixed list with a questionnaire assembled fresh for each inspection.

The word "compiled" is doing real work in that name. Nothing about a CVIQ is off-the-shelf. It is put together, question by question, specifically for the vessel being inspected, drawing on that vessel's type, trading history, and prior inspection record, alongside a much larger pool of questions OCIMF maintains centrally.

How the System Builds a CVIQ

Each CVIQ draws from roughly 100 questions pulled from OCIMF's central question library, but not at random. The selection follows a structured logic built from four question categories:

The practical result: two sister vessels of the same class, inspected in the same month, can receive noticeably different CVIQs — and the same vessel inspected twice, six months apart, will not see an identical set either.

A CVIQ isn't drawn once and reused — it's assembled fresh, every time, from a combination no crew can fully predict in advance. IMT Training Notes

What Each Question Actually Tests

Every question in a CVIQ maps to one of the three SIRE 2.0 assessment dimensions covered in our introduction to SIRE 2.0: Hardware, Procedures, and Human Factors. A CVIQ doesn't treat these as separate sections stapled together — questions are interleaved, so a single walk-through with an inspector might move from a hardware check, to a procedural question about that same piece of equipment, to a Human Factors follow-up asking the crew member to explain their reasoning.

That interleaving is deliberate. It's harder to prepare a rehearsed answer for a hardware question when the very next question asks you to justify the maintenance interval you just described.

Why the CVIQ Can't Be Memorised

The most common mistake IMT sees in fleets still adjusting to SIRE 2.0 is treating CVIQ preparation like exam revision — trying to anticipate the exact questions that will come up. That approach worked reasonably well under VIQ7's fixed list. It does not work here, for a simple structural reason: the pool a CVIQ draws from is large enough, and the selection logic varied enough, that no two inspections reliably overlap.

What does transfer between inspections is competence — the ability to explain why a procedure exists and demonstrate it under questioning, rather than recite it. Crews that train for that underlying competence perform consistently well regardless of which specific questions their CVIQ happens to include.

Download the CVIQ Question Library Breakdown (PDF)

A category-by-category map of Core, Rotational, Campaign, and Conditional questions, with example question types for each.

We'll also send you one maritime compliance update per week. Unsubscribe anytime.

What This Means for Crew Preparation

Practical steps IMT recommends specifically for CVIQ readiness:

Not Sure How Your CVIQ History Looks?

Talk to an IMT compliance advisor about reviewing your fleet's recent CVIQ patterns and gaps.

Contact an Expert

Common Misunderstandings About the CVIQ

Get Your Crew SIRE 2.0 Ready

IMT's SIRE 2.0 Readiness course walks your officers and crew through real CVIQ scenarios, human factor interview technique, and hardware documentation practice.

View the Course Talk to an Advisor

Download Center

Everything from this article, in a format you can print, share, or file.

Guide · PDF

CVIQ Question Library Breakdown

Get Resource →
Checklist · XLSX

CVIQ Category Tracker

Get Resource →
Template · DOCX

Mixed-Dimension Drill Template

Get Resource →
Case Study · PDF

Cutting Detentions by 40%

Read Case Study →
Briefing Deck · PPTX

Crew Toolbox Talk: CVIQ

Get Resource →
Tracker · XLSX

Inspection History Log

Get Resource →

Frequently Asked Questions

What does CVIQ stand for?

Compiled Vessel Inspection Questionnaire — the bespoke question set OCIMF's system generates for each individual SIRE 2.0 inspection.

How many questions are in a typical CVIQ?

Roughly 100, drawn from a much larger central question library using Core, Rotational, Campaign, and Conditional selection logic.

Can two sister vessels get the same CVIQ?

It's possible for some overlap, particularly in Core questions, but the combination as a whole is very unlikely to match exactly, especially once Rotational and Conditional questions are factored in.

Do Campaign questions ever disappear?

Yes. Campaign questions are tied to a specific, time-limited OCIMF focus area. Once that campaign window closes, those questions stop appearing as a priority category.

What's the single biggest CVIQ preparation mistake?

Trying to predict specific questions rather than building genuine, explainable competence across Hardware, Procedures, and Human Factors.

Test Your Knowledge

5 questions · pass with 4/5 to unlock your CVIQ certificate.

1. What does CVIQ stand for?

2. Roughly how many questions are drawn for a typical CVIQ?

3. Which question category is tied to a time-limited industry focus area?

4. Why can't a crew reliably prepare by memorising a past CVIQ?

5. What triggers a Conditional question?

🏅

Congratulations!

Score: 5/5

Badge Earned — CVIQ Explained

You completed Lesson 2 / 10
CVIQ Explained
Continue: Human Factors →

References

Join 30,000+ Maritime Professionals

Get one practical compliance update in your inbox every week — no spam, unsubscribe anytime.

Need SIRE 2.0 training? Enrol