Home/Maritime Insights/SIRE 2.0 Inspection Preparation Checklist

SIRE 2.0 Guide · Maritime Insights

SIRE 2.0 Inspection Preparation Checklist

An IMT practical preparation resource based on publicly available OCIMF SIRE 2.0 programme documentation. Every item below is clearly labelled as an OCIMF requirement, a verified fact, or an IMT recommendation.

BASED ON OCIMF PROGRAMME DOCUMENTATION UPDATED AUGUST 2026 ~6 MIN READ
IMT
International Maritime Training Research Team

Maritime knowledge article · Reviewed against official and primary industry sources where applicable

Last updated September 2026

This checklist pulls together the practical preparation points covered across our SIRE 2.0 guides — what SIRE 2.0 is, what changed from VIQ7, how human factors are assessed, and how to prepare — into one scannable reference.

How to read this checklist: every item is labelled by source, so it's clear what OCIMF actually requires versus what's IMT's own practical advice.

OCIMF REQUIREMENT Stated directly in OCIMF's own programme documentation.
VERIFIED IN IMT GUIDES Follows directly from facts already verified in our SIRE 2.0 guides.
IMT RECOMMENDATION A practical suggestion from IMT — not an OCIMF requirement.

Documentation

  • Photo Repository refreshed within ~6 months, or immediately after any material change to the vesselKeeping the Photo Repository current helps ensure photographs remain representative of the vessel's actual condition.
    OCIMF REQUIREMENT
  • PIQ (Pre-Inspection Questionnaire) updated and accurateMust be current before each inspection, per OCIMF guidance.
    OCIMF REQUIREMENT
  • Certificate repository currentKept up to date alongside the PIQ ahead of each inspection.
    OCIMF REQUIREMENT
  • HVPQ (Harmonised Vessel Particulars Questionnaire) reflects the vessel's actual conditionPart of the standard pre-inspection data set alongside the PIQ.
    OCIMF REQUIREMENT
  • All pre-inspection work completed before requesting the inspection, not after bookingOCIMF's own recommendation, so the booking process itself isn't delayed.
    OCIMF REQUIREMENT

Crew Readiness

  • Crew can explain why a procedure exists, not just how to perform itHuman-based tasks are assessed through Performance Influencing Factors, which check understanding, not just execution.
    VERIFIED IN IMT GUIDES
  • Crew has practised explaining reasoning out loud, not just physical run-throughsInterview-style drills tend to be more useful preparation than scripted walkthroughs.
    IMT RECOMMENDATION
  • No reliance on memorising a fixed question listThe CVIQ is compiled per vessel and per inspection, and isn't shared with the operator in advance.
    VERIFIED IN IMT GUIDES
  • General familiarity with how human performance is assessedUnderstanding that inspectors use Performance Influencing Factors (PIFs) to explain ratings helps crew understand what's actually being evaluated.
    VERIFIED IN IMT GUIDES

Closing the Loop

  • All corrective actions from the previous inspection reviewed and closed outReports stay active in the OCIMF database for 12 months, visible to the next inspector.
    VERIFIED IN IMT GUIDES
  • Open findings checked before requesting the next inspectionBetter to catch an unresolved item internally than have the inspector find it first.
    IMT RECOMMENDATION

General Readiness

  • Preparation treated as continuous, not a pre-inspection scrambleOCIMF's own guidance recommends completing pre-inspection work well before requesting the inspection.
    OCIMF REQUIREMENT

IMT SIRE 2.0 Training

Want to build practical, working knowledge of SIRE 2.0 inspection requirements?

Explore IMT's online SIRE 2.0 training programme — self-paced, with a digital certificate on completion.

Explore SIRE 2.0 Training →

Frequently Asked Questions

Is this an official OCIMF checklist?

No. This is an IMT practical preparation resource based on publicly available OCIMF SIRE 2.0 programme documentation. Every item is labelled by source so it's clear what's an OCIMF requirement versus an IMT recommendation.

What's the difference between an OCIMF requirement and an IMT recommendation?

An OCIMF requirement is stated directly in OCIMF's own programme documentation. An IMT recommendation is a practical suggestion that follows logically from verified facts, but isn't itself an OCIMF-stated rule.

Does completing this checklist guarantee a clean SIRE 2.0 inspection?

No checklist can guarantee an outcome, since the CVIQ is compiled per vessel and per inspection and isn't shared with the operator in advance. This checklist addresses the preparation elements within an operator's control.

How often should these items be reviewed?

Documentation items like the Photo Repository should be refreshed at approximately six-month intervals per OCIMF guidance, but overall readiness is best treated as continuous rather than a one-time exercise before booking an inspection.

Explore More Maritime Insights